
exhaust is done. (for now) 3 inch dp stepped down to stock piping with a free glasspack i got from jdt18

wheels swapped (for now till winter is over)
alt has belt on now too. tomorrow will consist of some wiring and changing the fuel pump.
more pics will be up soon.

dirty

simple rinse off

simple enough.. i plan on redoing the exhaust with a 3 inch side dump but this will have to do for now.

what a mess!

interior finally coming together

roof rack just resting on roof

shiny!

:good:
haha its funny what a difference my camera makes compared to my phone!
i forgot pics of 2gn center console all cleaned up.. :pardon: o well i'll just post it in the car instead haha i just need to get the 2gn e brake from d when we trade parts!

well im further off than i thought and need to get more parts! but i still got some work done this weekend with brandon and jason.

fixed wiring harness and got the throttle cable connected to the tb

ic mounted

next on my list is to get a srt hotside ic pipe, new walbro 255, upgrade my ms board and get proper wiring harness. Also i need to get another laptop.
waiting on parts...
fattirebicycle is sending me a relocate kit, modern is shipping me a walbro, and i got some couplers and t-bolt clamps on the way.
hopefully i can find a srt lower charge pipe and heat shield soon. i'll be upgrading my ms soon too!
:sorry: it'll be done someday.....
also just bought riddlers old vacuum block so that should be on its way soon too!